Water intake system in the Lake of Valencia and storage in artificial lagoon for the Avicola Macundo

Guacara, carabobo state. Venezuela. 2014.

Summary

Client: Avícola Macundo.

Ubication: Guacara, Carabobo State.

DurationDecember 2007 a Febrary 2008.

ScopeDevelopment of Detail Engineering for Gravity water intake in the lake environment to feed pumping well located on the mainland.

Development of detailed engineering for the intake of water by gravity in the lacustrine environment to feed the pumping well located on the mainland, the pipe route to Granja and the design of a water storage lagoon for 900,000 lts.

It includes:

Lakeside: Elaboration of the detailed engineering project of the intake work up to the pumping pit.

  • Analysis and hydraulic design: calculation of length and diameter.
  • Analysis and structural design: Calculation of pipe thickness, concrete counterweights and burial requirements.
  • Products: Calculation Memory, Metric Computation and Plans in AUTOCAD format.

Pumping piping: Elaboration of detailed engineering of the pumping pipe to the lagoon. Includes the specifications for the bidding of the pumping equipment.

Lagoon. Elaboration of engineering for the construction of lagoon (open pond), for storage of pumped water.

Zone Recognition.

Topographic survey.